PROJECT:
Ezi Fab & Insulation was contracted by GCO Australia to complete the Insulation lagging and metal cladding for large pipework and mufflers for the Fredon Project in Ann Street in Brisbane. All pre fabrication was done off site in our Lytton based workshop and fitted on site after the installation of the insulation lagging used (Rockwool 650 blanket). Cladding used to complete this project was Zincalume 0.6mm sheet.